Large-Scale Project in the Heavyweight Category 🥊
- KOALO
- Jan 27
- 1 min read
The STRENGTH 🦾 of a solid team like JPC's is: Designing, creating, and believing in our projects, from estimation to installation!...
It’s also about working in harmony with a team of seasoned experts. 🔝
𝑻𝒉𝒊𝒔 𝒊𝒔 𝒉𝒐𝒘 𝒑𝒓𝒐𝒋𝒆𝒄𝒕𝒔 𝒍𝒊𝒌𝒆 𝒕𝒉𝒊𝒔 𝒃𝒆𝒄𝒐𝒎𝒆 𝒂 𝒓𝒆𝒂𝒍𝒊𝒕𝒚:
140,000 lbs of steel were moved across 2.3 km of railway tracks.
The lateral crossing of a railway bridge structure measuring 60 feet in length, with a total weight of 128,000 lbs, over a river, deep in the Gaspé forest, in December! 😬
So much creativity, ingenuity, and proactivity! 🚀
A big thank you to our client, Constructions BSL Inc.